Installation
and Operation Instructions
A)
YOUR PLASTIMAYD SPACE ARENA is made from the best materials available.
The air-inflated portion is transparent vinyl film specially formulated
to resist weathering and sunlight deterioration, retain flexibility
and perform well with reasonable care. The replacement zipper entry
is rip resistant vinyl-coated nylon.
B)
To complete cement deck installation of your SPACE ARENA, you will
need the following:
-
200 ea. 3/16" x 1-1/2" TAP-IT (or equal) nylon fasteners and screws
(furnished)
-
1 dozen 3/16" masonry drills
-
3/8" roto hammer or other deck drilling tool
-
Chalk line
-
Hammer
-
Track (furnished)
-
Track Clip (furnished)
-
Corner pieces (furnished)
C)
PRELIMINARY STEPS
A
SPACE ARENA track layout plan is included with each dome, indicating
exact measurements to be used. Care should be taken to measure accurately
and follow directions precisely. First, orient the layout plan to
the pool site. Then find the centerline points of the pool, both
width and length. From each centerline point, measure out half of
the width or length (as applicable) of the SPACE ARENA to be installed,
to determine points W, X, Y and Z as indicated on figure 1. Chalk
lines will be drawn from W to X, X to Z, Z to Y, and Y to W to mark
the perimeter of the SPACE ARENA where track will be placed. BEFORE
MARKING CHALK LINE, check to make sure corners are square and measurements
are accurate. Chalk straight lines as indicated. Then, round the
corners on a radius of 3'8" and mark as indicated by figure 2.
D)
INSTALLING THE TRACK
On
the chalk lines you have drawn, lay out anchoring channel, including
rounded corner pieces, butting strips end-to-end for a continuous
fit. It will be necessary to cut off some of the straight side strips
to conform to the layout diagram, but use maximum lengths possible
rather than several short pieces. The kerf cut corner pieces must
be used without further cutting and centered around the curve. Track
should be placed with the curved edge toward pool. A sufficient
number of track strips are included in the SPACE ARENA package to
accommodate the SPACE ARENA.
When
channel tracks are laid out satisfactorily, drill holes to accommodate
3/16" fasteners at intervals of approximately 8" - 12" except on
corner pieces, where additional holes will be needed to maintain
curvature. Drill completely through channel track to mark concrete
beneath.
Remove
track and roto hammer holes in concrete. Clean holes and hammer
nylon holders flush with deck. Screw down track using washers under
screw heads. With corner pieces, it may be necessary to force curvature
one screw at a time. |